试卷: LEED v4 OM模拟题D卷英文[查看] A single-story office building has a multiple-zone ventilation system. The ventilation calculations indicate the one of the zones does not provide enough air to meet the referenced standard. Which action should the project team take? 某单层建筑有一个通风系统为多区域供风。通风计算表明其中一个区域的新风量不满足参考标准要求。项目团队应采取以下哪项措施? A: Install a higher-rated MERV filter to the zone in need of more air 在需要更多空气的区域安装更高级别的MERV过滤设施 B: Increase the supply airflow to the zone in need of more air 在需要更多空气的区域增加新风供应 C: Check if the average airflow of all the zones is enough to meet the requirements 检查所有区域的平均供风量是否满足要求 D: Increase the size of the air returns in the space 增加空间内的回风 参考答案: B
本题解释: 选择B,本题解释All spaces must meet the minimum ventilation requirements. Compare the calculations with the required airflow and make adjustments if necessary.
Push more air into the space that doesn\'t meet the minimums and recalculate the ventilation rates. |
|