A project has many leased spaces but the building owner still wants to try to pu

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-12-22 11:37:54 |只看该作者 |正序浏览
试卷: LEED v4 OM模拟题D卷英文[查看]
A project has many leased spaces but the building owner still wants to try to pursue LEED certification. Because of the lease arrangement the project team is going to exclude 10% of the total gross building floor area from the LEED project boundary. Which credit cannot have the 10% area excluded from the submission?
项目有很多租户,但是业主仍想要申请LEED认证,根据规则,可以将10%的区域排除在认证之外,但是哪个得分点不能排除这10%区域
A: EA Prerequisite Minimum Energy Performance 最低性能表现
B: EQ Credit Green Cleaning - Custodial Effectiveness Assessment 清洁度调查
C: EQ Prerequisite Environmental Tobacco Smoke Control 环境烟控
D: EQ Prerequisite Minimum IAQ Performance 最小新风量要求

参考答案: C

本题解释:
选择C,本题解释ETS Control applies to 100% of the building with no tenant space exclusions.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 06:15 , Processed in 0.087503 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部