试卷: LEED v4 OM模拟题A卷英文[查看] The groundskeeper for a project has determined a new building will not require long-term irrigation for the property. Which pieces of information will need to be documented in the plant species and water requirement narrative for WE Credit Outdoor Water Use Reduction?(Choose 2)
项目的场地管理员已确定一座新建筑不需要长期灌溉。针对WE得分项,室外节水,在植物种类和用水需求叙述中需要记录哪些信息?(选2项)
A: A water budget 用水预算 B: A description of the plants 对植物的描述 C: A site plan showing the location of any temporary sprinkler heads 场地平面图,显示所有临时喷头的位置 D: An indication of why average rainfall will be sufficient 说明为什么平均降雨量已经足够 参考答案: BD
本题解释: 选择BD,本题解释 A.A water budget would not be used if the project team is using Option 1: No Irrigation Required. B.For this credit, a description of the plants and where they are located within the site plan is needed. C.A site plan would include the location and types of vegetation, not where sprinkler heads are installed. D.For Option 1: No Irrigation Required, the narrative must include why average rainfall will be sufficient. |
|