- 注册时间
- 2012-6-6
- 最后登录
- 2026-2-6
- 阅读权限
- 200
- 积分
- 5734
- 精华
- 3
- 帖子
- 1765
  
|
试卷: LEED v4 OM模拟题B卷英文[查看] A project team is considering participating in a demand response program. When considering permanent load-shifting measures what systems, if present, would make good candidates to shift loads off-peak on a continuous basis?(Choose 3)
项目团队正在考虑加入需要响应计划。在考虑永久性负荷转移措施时,哪些系统能够在连续的基础上将负荷转移到非高峰时间? A: Hot water storage 存储热水 B: Ice storage 存储冰 C: Lighting 光照 D: Increased ventilation 增加的通风 E: EV charging stations 电动汽车充电站 参考答案: ABE
本题解释: 选择ABE,本题解释For permanent load shifting consider systems that can be run during non-peak hours (usually at night) that would have little impact on occupant use. |
|