- 注册时间
- 2012-6-16
- 最后登录
- 2023-9-11
- 阅读权限
- 150
- 积分
- 512
- 精华
- 0
- 帖子
- 213
 
|
试卷: LEED AP BD+C模拟题D[查看] A school project is located within 1.5 miles walking distance from 916 students in grades
9-12. The school is expected to have 1,200 students when complete. The school has built
two walking and biking routes, one going north and the other south. The school has a
busing system that uses 6 buses. What is true about the project’s ability to earn
Sustainable Sites Credit, Alternative Transportation-Public Transportation Access? A: The project has earned the credit B: The project would need to provide discount public bus passes for students C: The project would need to add two more busses D: The project would need the city to put a public bus stop next to the school entrance 参考答案: D
本题解释: Notes:
This high school project falls short of Option 3 Pedestrian Access. Only 916 students can
walk to school when 80% or 960 would have to be within walking distance. Since Option 3
is out, the project can earn the point by meeting the requirements of Option 2 Bus Stop
Proximity - locate within 1/4 walking distance or one or more stops for two or more public,
campus, or private bus lines. A school bus system can count as one line, so the project
would need to have a public bus stop near the school entrance for access to bus line
number two. |
|