LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 244|回复: 0
打印 上一主题 下一主题

A project is being built on a 6 acre Greenfield site. A civil engineer has deter

[复制链接]

1759

主题

1

好友

5684

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-8-28 19:45:07 |只看该作者 |倒序浏览
试卷: LEED AP BD+C模拟题D[查看]
A project is being built on a 6 acre Greenfield site. A civil engineer has determined that the
existing imperviousness of the site is 25%. The project team would like to qualify for Sustainable Sites Credit, Stormwater Design-Quantity Control. What stormwater management plans qualify for this credit? (choose 2)
A: Ensure the post-development peak discharge is less than or equal to the pre-development peak discharge
B: Reduce water runoff by 25%
C: Protect receiving stream channels from excessive erosion, including stream channel protection and quantity control strategies
D: Filter and treat water onsite

参考答案: AC

本题解释:
Notes:
Reference: Sustainable Sites Credit, Stormwater Design-Quantity Control, Requirements
A Greenfield site is completely undeveloped. The existing imperviousness would be less
than or equal to 50%, so Option 1 would need to be chosen from the requirements. The
two possible options that would qualify for Option 1 of the credit are “Protect receiving
stream channels from excessive erosion, including stream channel protection and
quantity control strategies” or “Ensure post-development peak discharge is less than or
equal to pre-development peak discharge”.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-5-7 02:08 , Processed in 0.089491 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部