What is true about implementing an erosion and sedimentation control plan for the grading of a Greenfield site?
A: The plan must follow the EPA Construction General Permit or local standards and codes (whichever is more stringent)
B: The plan must address at least 50% of the LEED project boundary
C: The plan must be approved by USGBC
D: The plan must address at least 75% of the property boundary

参考答案: A

本题解释:
Notes:

Reference: LEED 2009 for New Construction and Major Renovations Rating System
Erosion and sedimentation control protect air and waterways from construction pollution. These plans must follow the more stringent of the 2003 EPA General Permit or local standards and codes.

LEED does not require the plan to be implemented for a specific percentage of the project.

C plan is not approved by USGBC.

LEED does not require the plan to be implemented for a specific percentage of the project.


分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏1
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-7-7 21:26 , Processed in 0.073063 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部