LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 498|回复: 0
打印 上一主题 下一主题

A project team is using the performance rating method for Energy and Atmosphere

[复制链接]

1759

主题

1

好友

5692

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-12-7 15:30:55 |只看该作者 |倒序浏览
试卷: LEED AP BD+C模拟题C[查看]
A project team is using the performance rating method for Energy and Atmosphere Credit, Optimize Energy Performance. What are common mistakes to avoid for this method?(choose 3)
A: Not including manually operated shading devices
B: Not accounting for task lighting
C: Not supplying enough information for energy measures that incorporate the exceptional calculation methodology
D: Using fenestration assembly U-factor and SHGC instead of center-of-glass performance
E: Calculating non-tradable surfaces as tradable surfaces

参考答案: BCE

本题解释:
Notes:
Energy and Atmosphere Credit, Optimize Energy Performance, Calculations, Common Mistakes
Manually operated shades should be excluded from the model.
Using fenestration assembly U-factor and SHGC should be used instead of center-of-glass performance.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-7-7 21:14 , Processed in 0.077762 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部