LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 206|回复: 0
打印 上一主题 下一主题

A project will achieve NPD Prerequisite Walkable Streets. What increase in build

[复制链接]

203

主题

0

好友

512

积分

超级版主

Rank: 8Rank: 8

跳转到指定楼层
楼主
发表于 2013-7-24 14:56:08 |只看该作者 |倒序浏览
试卷: LEED AP ND模拟题D[查看]
A project will achieve NPD Prerequisite Walkable Streets. What increase in building-height-to-street-width ratio would a project need for NPD Credit Walkable Streets?

A: 15%
B: 10%
C: 40%
D: 25%

参考答案: D

本题解释:
The question asks for the \'increase\'. The prerequisite requires 15%. The credit requires 40%. The increase to achieve the credit option M is an additional 25%.

Just remember the prerequisite is 15% and the credit is 40%.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-7-8 00:10 , Processed in 0.078108 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部