A transit agency determines that transit stops will be warranted within two year

[复制链接]

203

主题

0

好友

512

积分

超级版主

Rank: 8Rank: 8

跳转到指定楼层
楼主
发表于 2013-7-24 14:56:09 |只看该作者 |倒序浏览
试卷: LEED AP ND模拟题C[查看]
A transit agency determines that transit stops will be warranted within two years of project completion. What can occur for a project to earn NPD Credit Transit Facilities?



(Choose 2)


A: The transit agency can agree to provide increased service to existing stops if those stops are installed at the project compl
B: The transit agency can agree to provide increased service to existing stops if those stops are installed at the time of 50% b
C: The developer can reserve space for transit shelters and bicycle storage at the new stops
D: The developer can increase the size of the shelters and bicycle storage at existing stops

参考答案: BC
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-7-8 00:15 , Processed in 0.076739 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部