When conducting a survey as part of the calculations for SS Credit 4 Alternative Commuting
Transportation, which dates/times are the best for surveys?
A: A survey conducted on Friday at the end of a five day workweek
B: A phone survey conducted in the evening
C: A survey conducted on Monday at the start of a workweek
D: A survey conducted on Wednesday in the middle of a workweek

参考答案: A

本题解释:
Notes:
See Reference Guide, SS Credit 4, Calculations, Option 3, Survey Timing
The survey needs to occur on five consecutive workdays, or on the Friday at the end of a
workweek. For circumstances where the building has normal work hours on weekends, the
survey can start/end on those days.
Weeks with holidays must be excluded.
Extreme weather periods should be avoided. Note the question asks what the best times
are. USGBC encourages surveys in spring or fall so that weather is not as much a factor.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-7-14 01:42 , Processed in 0.076987 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部