Which of the following project areas would retrocommissioning aid?
A: Operational energy efficiency
B: Identifying system problems prior to occupancy
C: Advanced energy metering
D: Selecting environmentally preferable products

参考答案: A

本题解释:
A:Retrocommissioning is ’a commissioning process that can be performed on existing buildings to identify and recognize system improvements that make the building more suitable for current use.’ - USGBC

Retrocommissioning usually occurs at least one year after the building has been occupied.

B:Commissioning (not retrocommissioning) identifies problems before occupancy.

C:This is not correct.

D:This is not correct.


分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-13 06:50 , Processed in 0.073520 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部