A project team is working with a general contractor to develop a site-specific p

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-9-19 13:38:34 |只看该作者 |倒序浏览
试卷: LEED v4 OM模拟题A卷英文[查看]
A project team is working with a general contractor to develop a site-specific plan before the start of some facility upgrades. What must the construction activity plan address for SS Credit Site Management?(Choose 2)
在设施升级开始之前,项目团队正在与总承包商合作制定特定场地计划。为了SS得分项场地管理,施工活动计划需要应对什么?(选2项)
A: Preventing air pollution from construction dust 防止施工灰尘对空气造成污染
B: Reducing the emissions from construction equipment 减少施工设备的排放
C: Replacing turf areas 更换草坪区域
D: Restoring any eroded soils 恢复任何侵蚀的土壤

参考答案: AD

本题解释:
选择AD,本题解释 Teams pursuing this credit must prevent erosion sedimentation, restore any eroded soils, and prevent air pollution from construction materials and activities.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-13 07:18 , Processed in 0.073359 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部