A daycare facility has children’s toilets. What should the plumbing engineer ve

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-9-23 14:57:29 |只看该作者 |倒序浏览
试卷: LEED v4 ID+C模拟题A卷英文[查看]
A daycare facility has children’s toilets. What should the plumbing engineer verify?
A: The flush rates are excluded from the design case
B: The flush rate is 50% less than a commercial toilet
C: The uses per day of the toilets is lower than that for adults
D: The flush rates of the flush valves are compatible with the bowl size to ensure performance

参考答案: D

本题解释:
Notes:D: For unique or nonstandard toilets and fixtures the flow/flush rates need to be compatible.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-13 02:11 , Processed in 0.076878 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部