试卷: LEED v4 ID+C模拟题A卷英文[查看] If a project team is pursuing both IP Credit Integrative Process and EA Credit Optimize Energy Performance, which action should occur first? A: Use of the exceptional calculation method for unregulated loads B: A basic energy analysis prior to conducting the energy simulation C: Determination the energy costs savings D: Creation of a baseline energy model 参考答案: B
本题解释: Notes: For option 1 Whole-Building Energy Simulation, if projects are also pursuing the Integrative Process credit, then the project team must identify the requirements for concept-level energy modeling to determine how to coordinate the overall model of development. The basic energy analysis for the Integrative Process credit must be done before conducting the energy simulation. |
|