LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 292|回复: 0
打印 上一主题 下一主题

If a project team is pursuing both IP Credit Integrative Process and EA Credit O

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-9-23 17:20:01 |只看该作者 |倒序浏览
试卷: LEED v4 ID+C模拟题A卷英文[查看]
If a project team is pursuing both IP Credit Integrative Process and EA Credit Optimize Energy Performance, which action should occur first?
A: Use of the exceptional calculation method for unregulated loads
B: A basic energy analysis prior to conducting the energy simulation
C: Determination the energy costs savings
D: Creation of a baseline energy model

参考答案: B

本题解释:
Notes: For option 1 Whole-Building Energy Simulation, if projects are also pursuing the Integrative Process credit, then the project team must identify the requirements for concept-level energy modeling to determine how to coordinate the overall model of development. The basic energy analysis for the Integrative Process credit must be done before conducting the energy simulation.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-13 01:05 , Processed in 0.075757 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部