A 10,000 SF (929 m2) office project is not being completely built-out for the te

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-9-23 17:42:44 |只看该作者 |倒序浏览
试卷: LEED v4 ID+C模拟题A卷英文[查看]
A 10,000 SF (929 m2) office project is not being completely built-out for the tenants to allow for future expansion and flexibility in adapting the space later. What maximum amount of space can be incomplete and still allow the project to be certified?
A: 6,000 SF (557 m2)
B: 2,000 SF (185 m2)
C: 4,000 SF (371 m2)
D: 5,000 SF (464 m2)

参考答案: C

本题解释:
Notes:C:At most 40% of the certifying gross floor area can remain incomplete.

分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-13 01:07 , Processed in 0.075086 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部