- 注册时间
- 2012-6-6
- 最后登录
- 2025-9-5
- 阅读权限
- 200
- 积分
- 5712
- 精华
- 3
- 帖子
- 1765
  
|
试卷: LEED v4 ID+C模拟题C卷英文[查看] A LEED reviewer has sent a project team technical advice on one of the design credits that was submitted in a split review. What does the project team need to do? A: Update the narrative of the credit and resubmit it for another design review B: Document a narrative for the technical advice and submit it during any appeals process C: Respond to the technical advice the LEED reviewer sent D: Nothing, it is up to the project team if they want to take the advice of the reviewer 参考答案: C
本题解释: Notes:C:When a LEED reviewer responds to a credit/prerequisite the review will contain comments and technical advice. Technical advice includes things that need to be revised and updated for the credit/prerequisite to be earned. An example might be \'Revise the building operating plan to include all design setpoints for all HVAC equipment throughout the building.\' or \'Provide a revised preventive maintenance plan that includes...\'. |
|