After the owner documents their owner\\\'s project requirements (OPR), the proje

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-9-30 09:29:02 |只看该作者 |倒序浏览
试卷: LEED v4 ID+C模拟题C卷英文[查看]
After the owner documents their owner\'s project requirements (OPR), the project team will take that document to create the basis of design (BOD). What would be contained in the BOD?
A: Operating mode tests, sustainability goals, occupant functions
B: Systems and assemblies, governing codes and standards, performance criteria and assumptions
C: Energy efficiency goals, number of occupants, building schedule
D: Functional testing, training requirements, issue resolution process

参考答案: B

本题解释:
Notes: See the Further Explanation in the prerequisite for the different document types and what each includes (too extensive to include here). Test-takers should be familiar with the content that goes into each of the following:
OPR
BOD
Cx Plan
Cx Report
CFR and Operations and Maintenance plan
Systems Manual (Enhanced Cx)
Ongoing Cx Plan (Enhanced Cx)
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 21:25 , Processed in 0.075759 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部