The owner an office project wants to use 50% green power, but the direct purchas

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-10-3 08:46:59 |只看该作者 |倒序浏览
试卷: LEED v4 ID+C模拟题D卷英文[查看]
The owner an office project wants to use 50% green power, but the direct purchase of Green-e certified power is not available through the local utilities. An energy model was not done for EA Credit, Optimize Energy Performance. What information is NOT required when determining the quantity of RECs to purchase?
A: Median electrical intensity (kWh/sf-yr)
B: Total building area (sq. ft.)
C: Emissions criteria for the non-renewable portion of the electricity
D: Building type

参考答案: C

本题解释:
选择C,本题解释The question asks what information will not be required. Emissions criteria would not be used.
The CBECS database uses the building type and total building area to determine the default electricity consumption.
The median electrical intensity will be used to determine the required green power quantity.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 18:16 , Processed in 0.074052 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部