A LEED AP is exploring possible strategies for a project\\\'s energy related sys

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-10-3 08:59:23 |只看该作者 |倒序浏览
试卷: LEED v4 ID+C模拟题D卷英文[查看]
A LEED AP is exploring possible strategies for a project\'s energy related systems. Which aspects must be evaluated for a simple box energy model to earn Integrative Process credit?
A: Thermal comfort ranges, plug and process loads, and off-site parking
B: Lighting levels, indoor water-use demand, and proximity to public transportation
C: Building envelope attributes, programmatic and operational parameters, and lighting levels
D: Building envelope attributes, thermal comfort ranges, and acoustics

参考答案: C

本题解释:
选择C,本题解释There are five aspects to consider for energy analysis:
Building envelope attributes
Programmatic and operational parameters
Lighting levels
Thermal comfort ranges
Plug and process load needs
Project teams must assess at least two potential strategies for each aspect (so at least 10 things total are being checked).
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 16:38 , Processed in 0.080664 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部