The entire water supply for a building is provided by a public water supply and

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-12-22 11:37:53 |只看该作者 |倒序浏览
试卷: LEED v4 OM模拟题A卷英文[查看]
The entire water supply for a building is provided by a public water supply and uses a single water meter. The meter is not accessible for reporting to achieve WE Prerequisite Building-Level Water Metering. Which action can the project team take to track water usage?
建筑所有的用水,来自市政供水,并按照了一个总水表。这个水表不方便读数,不能满足WE先决条件 建筑整体用水计量。项目团队可以采取哪些措施来跟踪用水情况?
A: Use the design case calculations for the indoor and outdoor water use prerequisites使用设计计算来满足室内和室外用水的先决条件
B: Use the baseline water use calculations minus any non-potable water use sources使用基线用水量计算值减去任何非饮用水用量来源
C: Install a second private water meter downstream of the public water supply meter在市政水表下游安装一个私人水表
D: Estimate the monthly usage based on the occupancy rate根据入住率,预估每月用水量

参考答案: C

本题解释:
选择C,本题解释 Location, access, and reporting are three things that should be verified for the prerequisite. The project team needs to be able to obtain the metered data for reporting.A private meter installed downstream but before all water subsystems is a way to get data.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 16:38 , Processed in 0.075922 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部