A project team has completed identifying all equipment that will be included in

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-12-22 11:37:54 |只看该作者 |倒序浏览
试卷: LEED v4 OM模拟题A卷英文[查看]
A project team has completed identifying all equipment that will be included in an energy audit. When coming up with an auditing schedule what should be taken into consideration?(Choose 2)
项目团队已经确定所有需要包含在能源审计过程中的设备。接下来的审计计划表中需要考虑哪些?(选2项)
A: The location of utility meters 市政仪表位置
B: Acceptable payback period of capital projects 项目可接受的资本回报期
C: The operating schedules of the equipment 设备的运营计划表
D: Length of the performance period 绩效期的长度

参考答案: CD

本题解释:
选择CD,本题解释 C.If it\'s summertime you can\'t audit the heating system. D.Because of the seasonal operating times of some equipment the performance period becomes a factor.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 04:57 , Processed in 0.078090 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部