LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 339|回复: 0
打印 上一主题 下一主题

A building owner’s project includes a major HVAC renovation, significant envelo

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2014-6-5 16:04:12 |只看该作者 |倒序浏览
试卷: LEED v4 GA模拟题A卷[查看]
A building owner’s project includes a major HVAC renovation, significant envelope modifications, and core plumbing renovation. An interior fit-out is not part of the project. What LEED rating system would be most appropriate for this project?
A: LEED BD+C: Core and Shell
B: LEED BD+C: New Construction
C: LEED O+M: Existing Buildings
D: LEED ID+C: Commercial Interiors

参考答案: A

本题解释:
A:LEED BD+C: Core and Shell is appropriate for buildings that are undergoing new construction or major renovation on its exterior shell and core mechanical, electrical, and plumbing units but NOT a complete interior fit-out. (-USGBC)
B:This rating system is appropriate for buildings that are undergoing new construction or major renovation (or gut rehab, for low- and mid-rise residential) and a complete interior fit-out. (-USGBC)
C:This rating system is appropriate for existing whole buildings. Typically, these buildings undergo only improvement work. (-USGBC)
D:This rating system is appropriate for interior spaces that are undergoing alteration work for at least 60% of the certifying gross floor area. (-USGBC)


分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-13 04:55 , Processed in 0.074513 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部