- 注册时间
- 2012-6-6
- 最后登录
- 2025-7-5
- 阅读权限
- 200
- 积分
- 5692
- 精华
- 3
- 帖子
- 1765
  
|
试卷: LEED AP BD+C模拟题B[查看] A new veterinary office is being built on a greenfield site. The office and parking lot will take up 4 acres of the 5 acre piece of land. What structural controls can both help control soil erosion and help improve the quality of stormwater runoff? A: Sediment basin B: Disconnecting impervious areas C: Mulching D: Seeding 参考答案: A
本题解释: Notes:
The following are structural controls for Sustainable Sites Prerequisite, Construction Activity Pollution Prevention:
-Earth dike
-Silt fence
-Sediment trap
-Sediment basin
The sediment basin is a pond that will help control erosion and remove pollutants from runoff.
|
|