LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 301|回复: 0
打印 上一主题 下一主题

A new veterinary office is being built on a greenfield site. The office and park

[复制链接]

1759

主题

1

好友

5692

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-11-1 00:48:35 |只看该作者 |倒序浏览
试卷: LEED AP BD+C模拟题B[查看]
A new veterinary office is being built on a greenfield site. The office and parking lot will take up 4 acres of the 5 acre piece of land. What structural controls can both help control soil erosion and help improve the quality of stormwater runoff?
A: Sediment basin
B: Disconnecting impervious areas
C: Mulching
D: Seeding

参考答案: A

本题解释:
Notes:
The following are structural controls for Sustainable Sites Prerequisite, Construction Activity Pollution Prevention:
-Earth dike
-Silt fence
-Sediment trap
-Sediment basin
The sediment basin is a pond that will help control erosion and remove pollutants from runoff.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-7-7 05:35 , Processed in 0.072048 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部