A 10 acre multi-building development has five buildings. How is the LEED boundar

[复制链接]

1759

主题

1

好友

5684

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-9-7 21:49:40 |只看该作者 |倒序浏览
试卷: LEED GA模拟题D[查看]
A 10 acre multi-building development has five buildings. How is the LEED boundary determined if each building will be a separate LEED project?
A: The LEED boundary is at the perimeter of the ten-acre area
B: Each building has the boundary at the edge of a two-acre area
C: The project team determines the LEED boundary for each LEED project
D: The LEED boundary is at the edge of each building’s footprint

参考答案: C

本题解释:
A:The boundary would not be the entire 10 acres for each building.
B:A 10 acre project with 5 buildings does not mean the project will be divided evenly into 5 equally sized 2 acre project areas.
C:The LEED boundary is the portion of the project site submitted for LEED certification. For single-building developments, this is the entire project scope and is generally limited to the site boundary. For multiple building developments, the LEED project boundary may be a portion of the development as determined by the project team. (-USGBC)
D:The boundary would not be set to the edge of the building footprint.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-5-7 03:55 , Processed in 0.075798 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部