试卷: LEED GA模拟题E[查看] For LEED, if a project has an existing CFC-based refrigeration system and it is not economically feasible to replace the system, what maximum annual leakage of the existing system is allowed? A: 3% B: 0% C: 1% D: 5% 参考答案: D
本题解释: Notes:
Reference: LEED 2009 for New Construction and Major Renovations Rating System
For buildings with existing systems that use CFC-based refrigerants, the systems must be phased out within 5 years after the project is completed, unless a third-party audit shows the simple payback for retrofitting/replacement is more than 10 years.
For such projects, the refrigerant leakage rate must be reduced to no more than 5% each year. |
|