76. Use renewable sources for landscape electricity needs
Option 1

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2017-6-13 15:23:47 |只看该作者 |倒序浏览
试卷: SITES AP英文选择题(v2)A[查看]
76. Use renewable sources for landscape electricity needs
Option 1
-Use on-site renewable energy sources for 50% (3pts) or 100% (4pts) annual outdoor site electricity
-Calc energy generated by quantity (kW) not cost

*Community renewable energy system (solar garden) allowed if requirements met as follows
-ownership in system or signed lease agreement for 15+ yrs
-system located in same utility service area as facility claiming use
-percentage of credit based on % ownership/utilization compared to site outdoor electricity use

Option 2
Engage in contract (min 5 yrs) for delivery of green power or offsets from qualified resources since 2005. Contract specifies quantity, not cost, to provide 50% (3pts) or 100% (4pts) of annual outdoor site electricity.

A: Section 8: Credit 8.6 Requirements (2 Options)
B: Section 8: Credit 8.4 Requirements Option 1
C: Section 8: Credit 8.4 Requirements
D: Section 8: Credit 8.4 Documentation Option 2

参考答案: A
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-11 22:43 , Processed in 0.077582 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部