试卷: SITES AP英文选择题(v2)A[查看] 76. Use renewable sources for landscape electricity needs
Option 1
-Use on-site renewable energy sources for 50% (3pts) or 100% (4pts) annual outdoor site electricity
-Calc energy generated by quantity (kW) not cost
*Community renewable energy system (solar garden) allowed if requirements met as follows
-ownership in system or signed lease agreement for 15+ yrs
-system located in same utility service area as facility claiming use
-percentage of credit based on % ownership/utilization compared to site outdoor electricity use
Option 2
Engage in contract (min 5 yrs) for delivery of green power or offsets from qualified resources since 2005. Contract specifies quantity, not cost, to provide 50% (3pts) or 100% (4pts) of annual outdoor site electricity.
A: Section 8: Credit 8.6 Requirements (2 Options) B: Section 8: Credit 8.4 Requirements Option 1 C: Section 8: Credit 8.4 Requirements D: Section 8: Credit 8.4 Documentation Option 2 参考答案: A |
|