试卷: LEED AP BD+C模拟题D[查看]
A school project must complete an additional requirement to qualify for IAQ management
during construction. What additional requirement does this project have to do once the
building is enclosed?
A: Use MERV 13 filters instead of MERV 8 filters
B: Protect installed absorptive materials from moisture damage
C: Prohibit smoking inside the building and within 25 feet of building entrances
D: Exceed the SMACNA guidelines

参考答案: C

本题解释:
Notes:
Reference: Indoor Environmental Quality Credit, Construction Indoor Air Quality
Management Plan-During Construction, Requirements
This question is for schools which require prohibiting smoking During Construction after
the building is enclosed.
School projects must prohibit smoking in the building and prohibit smoking within 25 feet
of the building entrance once the building is enclosed.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-5-7 04:12 , Processed in 0.076588 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部