Which of the following projects requires a master site for registration?

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2015-2-1 23:03:43 |只看该作者 |正序浏览
试卷: LEED v4 GA模拟题B卷[查看]
Which of the following projects requires a master site for registration?
A: A 3-story multifamily project
B: A campus project
C: A LEED BD+C: Schools project
D: A LEED BD+C: Healthcare project

参考答案: B

本题解释:
正确答案:B
系统解析: Knowledge Domain: LEED Process

Campus credits allow eligible LEED credits and prerequisites to be documented once for the entire area and development within a LEED campus boundary. These campus credits are earned through a separate review in the master site. Once reviewed and earned in the master site, campus credits are available to LEED projects (both individual and group projects) associated with the same master site and located within that same LEED campus boundary. All campus credit information is documented within a master site. Projects on the campus that submit for certification review and reference the master site can utilize the campus credits earned in the master site review. When registering a master site, please use the words master site in the title (for example, State University Master Site).

LEED certification process > role of documentation submission [Campus Guidance: http://www.usgbc.org/resources/campus-guidance ]
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-13 19:45 , Processed in 0.078149 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部