试卷: LEED v4 GA模拟题B卷[查看] Which of the following projects requires a master site for registration? A: A 3-story multifamily project B: A campus project C: A LEED BD+C: Schools project D: A LEED BD+C: Healthcare project 参考答案: B
本题解释: 正确答案:B
系统解析: Knowledge Domain: LEED Process
Campus credits allow eligible LEED credits and prerequisites to be documented once for the entire area and development within a LEED campus boundary. These campus credits are earned through a separate review in the master site. Once reviewed and earned in the master site, campus credits are available to LEED projects (both individual and group projects) associated with the same master site and located within that same LEED campus boundary. All campus credit information is documented within a master site. Projects on the campus that submit for certification review and reference the master site can utilize the campus credits earned in the master site review. When registering a master site, please use the words master site in the title (for example, State University Master Site).
LEED certification process > role of documentation submission [Campus Guidance: http://www.usgbc.org/resources/campus-guidance ]
|
|