试卷: LEED v4 OM模拟题D卷英文[查看] In a multi-tenant project several tenants have contracts with waste haulers that recycle materials separately from the building waste. How would the project team handle this situation for MR Credit Solid Waste Management - Ongoing?
某项目用多个租户,有些租户有自己的垃圾回收商来单独回收垃圾,项目团队怎么做才可以满足MR得分点 - 持续性垃圾处理
A: Include the metrics in the waste calculations 将该租户的数据包括在计算中 B: Exclude the waste from the calculations 将该租户的数据排除在计算中 C: If the tenant spaces are equal to 20% or less of the gross floor area they can be excluded 如果租户面积小于项目面积的20%,则可以排除 D: Estimate the waste based on the percent size of the tenant spaces compared to the overall building\'s waste stream按大楼总体垃圾回收量的 参考答案: A
本题解释: 选择A,本题解释A.The data from the haulers may improve the projects overall diversion rate so it should be included. C.20% of the space cannot be excluded. D.This is not allowed. |
|