In a multi-tenant project several tenants have contracts with waste haulers that

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-12-22 11:37:54 |只看该作者 |倒序浏览
试卷: LEED v4 OM模拟题D卷英文[查看]
In a multi-tenant project several tenants have contracts with waste haulers that recycle materials separately from the building waste. How would the project team handle this situation for MR Credit Solid Waste Management - Ongoing?
某项目用多个租户,有些租户有自己的垃圾回收商来单独回收垃圾,项目团队怎么做才可以满足MR得分点 - 持续性垃圾处理

A: Include the metrics in the waste calculations 将该租户的数据包括在计算中
B: Exclude the waste from the calculations 将该租户的数据排除在计算中
C: If the tenant spaces are equal to 20% or less of the gross floor area they can be excluded 如果租户面积小于项目面积的20%,则可以排除
D: Estimate the waste based on the percent size of the tenant spaces compared to the overall building\'s waste stream按大楼总体垃圾回收量的

参考答案: A

本题解释:
选择A,本题解释A.The data from the haulers may improve the projects overall diversion rate so it should be included. C.20% of the space cannot be excluded. D.This is not allowed.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 07:27 , Processed in 0.075428 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部