A public utility uses proprietary wireless technology to read the water meter fo

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-12-22 11:37:54 |只看该作者 |正序浏览
试卷: LEED v4 OM模拟题D卷英文[查看]
A public utility uses proprietary wireless technology to read the water meter for a project building. Since access to the water-metering data is restricted, which statement is true of the project team\'s ability to achieve WE Prerequisite Building-Level Water Metering?
某项目的水表是远程无线监控的,但是读数是保密的,那么项目团队怎么做可以满足WE先决条件-建筑用水计量的要求?
A: The project team can meet the prerequisite by submetering 80% of the potable water use systems. 为80%的自来水消耗安装分项计量
B: The project will achieve the prerequisite because the data is not available. 因为数据无法获取,所以可以直接满足要求
C: The project team can track water usage through monthly billing statements. 可以提交月度水费账单来查阅水耗
D: The project team will need to install a private meter upstream of the public water supply. 需要在用水总管再安装一个水表

参考答案: C

本题解释:
选择C,本题解释A.The potable water use of the whole building and grounds must be metered. C.When the meter is inaccessible, utility bills will suffice. D.A private meter would be installed downstream, not upstream.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 08:46 , Processed in 0.085957 second(s), 27 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部