- 注册时间
- 2012-6-6
- 最后登录
- 2025-9-5
- 阅读权限
- 200
- 积分
- 5712
- 精华
- 3
- 帖子
- 1765
  
|
试卷: LEED v4 OM模拟题B卷英文[查看] What are examples of things a project team would need to do during the performance period for SS Credit Site Improvement Plan?(Choose 2)
项目团队在运营期间需要为SS得分项 场地改良计划 做哪些?(选2项) A: Replace impervious parking lot with pervious paving 将停车场的非渗透地面换成渗透地面 B: Install a vegetated roof 安装绿化屋顶 C: Install plants to preserve eroding soil 种植植物来预防土壤侵蚀 D: Install a rainwater harvesting system 安装雨水回收系统 E: Replace 10% of the turf area with native plants 将10%的草坪区域换成本土植物 参考答案: CE
本题解释: 选择CE,本题解释In the performance period implement no and low cost measures to improve the site.
Capital expenditures do not have to be implemented, but you can\'t count everything as a capital expenditure to avoid doing anything.
While specific costs were not included in the answer choices it should be easy to distinguish between the choices that are going to be low/no cost and those that are capital improvements. |
|