LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 795|回复: 0
打印 上一主题 下一主题

What are examples of things a project team would need to do during the performan

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-12-22 11:37:54 |只看该作者 |倒序浏览
试卷: LEED v4 OM模拟题B卷英文[查看]
What are examples of things a project team would need to do during the performance period for SS Credit Site Improvement Plan?(Choose 2)
项目团队在运营期间需要为SS得分项 场地改良计划 做哪些?(选2项)
A: Replace impervious parking lot with pervious paving 将停车场的非渗透地面换成渗透地面
B: Install a vegetated roof 安装绿化屋顶
C: Install plants to preserve eroding soil 种植植物来预防土壤侵蚀
D: Install a rainwater harvesting system 安装雨水回收系统
E: Replace 10% of the turf area with native plants 将10%的草坪区域换成本土植物

参考答案: CE

本题解释:
选择CE,本题解释In the performance period implement no and low cost measures to improve the site.
Capital expenditures do not have to be implemented, but you can\'t count everything as a capital expenditure to avoid doing anything.
While specific costs were not included in the answer choices it should be easy to distinguish between the choices that are going to be low/no cost and those that are capital improvements.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 08:38 , Processed in 0.080936 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部