试卷: LEED v4 OM模拟题D卷英文[查看] What must a project team do during the performance period for energy metering?(Choose 2)
在绩效期的能源分项计量,需要注意什么(选2项)
A: Compile data and share it with USGBC 整理数据并与USGBC分享 B: Reduce energy use from each end use that represents 20% or more of total annual building energy consumption 降低建筑20%的能耗 C: Install any new submeters required 安装新的分项计量 D: Program systems to alarm when readings deviate more than 5% from expected 当读数超过预期值5%时,发出警报 参考答案: AD
本题解释: 选择A,本题解释A.Sharing data is required for the prerequisite B.Reductions are not required from the submetered systems. The data will inform building operations as to what systems are candidates for reductions. C.For both the prerequisite and credit, meters are installed during the establishment period while energy data is collected during the performance period. D.Alarms are required for Advanced Energy Metering |
|