LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 289|回复: 0
打印 上一主题 下一主题

What must a project team do during the performance period for energy metering?(C

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-12-22 11:37:54 |只看该作者 |倒序浏览
试卷: LEED v4 OM模拟题D卷英文[查看]
What must a project team do during the performance period for energy metering?(Choose 2)
在绩效期的能源分项计量,需要注意什么(选2项)

A: Compile data and share it with USGBC 整理数据并与USGBC分享
B: Reduce energy use from each end use that represents 20% or more of total annual building energy consumption 降低建筑20%的能耗
C: Install any new submeters required 安装新的分项计量
D: Program systems to alarm when readings deviate more than 5% from expected 当读数超过预期值5%时,发出警报

参考答案: AD

本题解释:
选择A,本题解释A.Sharing data is required for the prerequisite B.Reductions are not required from the submetered systems. The data will inform building operations as to what systems are candidates for reductions. C.For both the prerequisite and credit, meters are installed during the establishment period while energy data is collected during the performance period. D.Alarms are required for Advanced Energy Metering
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 07:32 , Processed in 0.074725 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部