LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 318|回复: 0
打印 上一主题 下一主题

A project team is establishing a minimum level of efficiency for a new school pr

[复制链接]

1759

主题

1

好友

5684

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-8-28 19:45:07 |只看该作者 |倒序浏览
试卷: LEED AP BD+C模拟题C[查看]
A project team is establishing a minimum level of efficiency for a new school project. A whole building energy simulation will be used on the project. What additional step must occur for the project that would not be needed for a LEED for New Construction project?
A: Comply with the mandatory provisions in ASHRAE 90.1-2007
B: Use default process energy costs of 25%
C: Demonstrate a 10% improvement in the proposed building performance
D: Establish an energy performance rating goal for the facility design using EPA’s Target Finder rating tool

参考答案: D

本题解释:
Notes:
Reference: Energy and Atmosphere Prerequisite, Minimum Energy Performance, Requirements One of the Minimum Energy Performance requirements for school is to establish an energy performance rating goal for the facility design using EPA’s Target Finder rating tool. This is however not a requirement for NC projects.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-5-7 02:07 , Processed in 0.074974 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部