- 注册时间
- 2012-6-6
- 最后登录
- 2025-4-28
- 阅读权限
- 200
- 积分
- 5684
- 精华
- 3
- 帖子
- 1765
  
|
试卷: LEED AP BD+C模拟题C[查看] A project team is establishing a minimum level of efficiency for a new school project. A whole building energy simulation will be used on the project. What additional step must occur for the project that would not be needed for a LEED for New Construction project? A: Comply with the mandatory provisions in ASHRAE 90.1-2007 B: Use default process energy costs of 25% C: Demonstrate a 10% improvement in the proposed building performance D: Establish an energy performance rating goal for the facility design using EPA’s Target Finder rating tool 参考答案: D
本题解释: Notes:
Reference: Energy and Atmosphere Prerequisite, Minimum Energy Performance, Requirements One of the Minimum Energy Performance requirements for school is to establish an energy performance rating goal for the facility design using EPA’s Target Finder rating tool. This is however not a requirement for NC projects. |
|