A single-story office building has a multiple-zone ventilation system. The venti

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-9-30 15:38:58 |只看该作者 |倒序浏览
试卷: LEED v4 ID+C模拟题C卷英文[查看]
A single-story office building has a multiple-zone ventilation system. The ventilation calculations indicate one of the zones does not provide enough air to meet the referenced standard. Which action should the project team take?
A: Check if the average airflow of all the zones is enough to meet the requirements
B: Increase the size of the air returns in the space
C: Install a higher-rated MERV filter to the zone in need of more air
D: Increase the supply airflow to the zone in need of more air

参考答案: D

本题解释:
Notes:D:All spaces must meet the minimum ventilation requirements. Compare the calculations with the design airflow and revise the design if necessary.
Push more air into the space that doesn\'t meet the minimums and recalculate the ventilation rates.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 21:50 , Processed in 0.080710 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部