- 注册时间
 - 2012-6-6
 - 最后登录
 - 2025-9-5
 - 阅读权限
 - 200
 - 积分
 - 5712
 - 精华
 - 3
 - 帖子
 - 1765
  
 
 
 
    
 | 
试卷: LEED v4 OM模拟题B卷英文[查看]   Which action must a project team take to achieve WE Prerequisite Building-Level Water Metering?(Choose 3)
 为满足WE先决条件 建筑整体用水计量,项目团队必须?   A: Commit to sharing five years of data with USGBC 承诺和USGBC分享5年的数据 B: Measure total potable water use of the site grounds 测量场地总的饮用水用水量 C: Measure total potable water use of the whole building 测量建筑的总的饮用水用水量 D: Install a building automation system to detect water leaks 安装建筑自动化系统来监测水的泄漏点 E: 为所有用水量超过10%的项目总用水量的用水子系统安装永久水表     参考答案: ABC 
  本题解释: 选择ABC,本题解释The building and grounds have to be metered for potable water use. The data must be shared with USGBC for a period of 5 years.
 The building water and the associated grounds water can either be metered together or separately. |   
 
  
 |