Which action must a project team take to achieve WE Prerequisite Building-Level Water Metering?(Choose 3)
为满足WE先决条件 建筑整体用水计量,项目团队必须?
A: Commit to sharing five years of data with USGBC 承诺和USGBC分享5年的数据
B: Measure total potable water use of the site grounds 测量场地总的饮用水用水量
C: Measure total potable water use of the whole building 测量建筑的总的饮用水用水量
D: Install a building automation system to detect water leaks 安装建筑自动化系统来监测水的泄漏点
E: 为所有用水量超过10%的项目总用水量的用水子系统安装永久水表

参考答案: ABC

本题解释:
选择ABC,本题解释The building and grounds have to be metered for potable water use. The data must be shared with USGBC for a period of 5 years.
The building water and the associated grounds water can either be metered together or separately.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 06:16 , Processed in 0.077396 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部