A project team is designing a stormwater management system to earn Sustainable S

[复制链接]

1759

主题

1

好友

5684

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-8-28 19:45:07 |只看该作者 |倒序浏览
试卷: LEED AP BD+C模拟题B[查看]
A project team is designing a stormwater management system to earn Sustainable Sites
Credit, Stormwater Design-Quantity Control. State and local regulations are not applicable
to the system. In order to use the harvested rainwater for irrigation, pressurization of the
system will be required. What else will the project team need to address based on adding
this feature?(choose 2)
A: Length of time the stormwater can be held
B: Conveyance system
C: Type of water treatment required
D: Commissioning of the system

参考答案: BD

本题解释:
Notes:
Reference: Sustainable Sites Credit, Stormwater Design-Quantity Control, Implementation
Pressurization will require a pump, pressure tank, and filter.
Pressurization will consume energy so the system will need to be commissioned.
Conveyance must be addressed to keep the stormwater from being connected to domestic or
commercial potable water systems.
State and local regulations would require the project to address the length of time stormwater can
be held and water treatment.
Don\'t confuse water treatment with pretreatment. Pretreatment is for removing debris and
sediment, while treatment is the removal of biological impurities and can involve the use of
chemicals.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-5-6 20:54 , Processed in 0.097365 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部