试卷: LEED AP BD+C模拟题B[查看] A project team is designing a stormwater management system to earn Sustainable Sites
Credit, Stormwater Design-Quantity Control. State and local regulations are not applicable
to the system. In order to use the harvested rainwater for irrigation, pressurization of the
system will be required. What else will the project team need to address based on adding
this feature?(choose 2) A: Length of time the stormwater can be held B: Conveyance system C: Type of water treatment required D: Commissioning of the system 参考答案: BD
本题解释: Notes:
Reference: Sustainable Sites Credit, Stormwater Design-Quantity Control, Implementation
Pressurization will require a pump, pressure tank, and filter.
Pressurization will consume energy so the system will need to be commissioned.
Conveyance must be addressed to keep the stormwater from being connected to domestic or
commercial potable water systems.
State and local regulations would require the project to address the length of time stormwater can
be held and water treatment.
Don\'t confuse water treatment with pretreatment. Pretreatment is for removing debris and
sediment, while treatment is the removal of biological impurities and can involve the use of