试卷: LEED GA模拟题F[查看] At what point can a project earn points for credits? A: After the construction phase B: After the design phase C: After the LEED Scorecard is completed and submitted D: After the statement of work has been uploaded to LEED Online 参考答案: A
本题解释: A: When a project opts for a split review there are separate reviews for the design phase and the construction phase. For the design phase those credits that can be reasonably assumed will be earned are marked as Anticipated or Denied. For the construction phase the credits will be marked as Awarded or Denied.
Points may be marked as Anticipated in LEED Online after the design phase but points are only Awarded (earned) after the construction phase. This is true of all credits and prerequisites.
B:No points can be earned after the design phase.
C:Uploading the scorecard does not earn a project points.
D: The project narrative, typical floor plans, and elevations are part of the required documentation for all LEED projects. Uploading this documentation does not earn a project any points. |
|