What is true about a new building project that uses a Halon based fire suppressi

[复制链接]

1759

主题

1

好友

5630

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-9-15 16:56:55 |只看该作者 |倒序浏览
试卷: LEED GA模拟题D[查看]
What is true about a new building project that uses a Halon based fire suppression system?
A: The system must have a leakage rate of 5% or less annually for the project to earn LEED certification
B: The project would not meet the LEED Minimum Program Requirements
C: The system must be installed to meet local fire codes
D: The project could not earn LEED Platinum

参考答案: C

本题解释:
Leakage rates must be addressed for existing buildings that have CFC-based refrigerants that will be phased out over a 5 year period after project completion. These systems must reduce the leakage rate to 5% or less annually.

Refrigerant management is not addressed in the Minimum Program Requirements.

LEED buildings still require meeting all local codes.

Fire systems must meet local fire codes, plumbing fixtures must meet local plumbing codes, and electrical systems must meet electrical codes.

D:The project would still be eligible for LEED Platinum.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享1 收藏收藏1
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2024-5-26 14:35 , Processed in 0.118332 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部