How can a project team reduce wastewater generation and potable water demand whi

[复制链接]

1759

主题

1

好友

5692

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-10-14 00:49:45 |只看该作者 |倒序浏览
试卷: LEED GA模拟题E[查看]
How can a project team reduce wastewater generation and potable water demand while increasing the local aquifer recharge for Innovative Wastewater Technologies?(choose 2)

A: Install drip irrigation
B: Reduce potable water use by installing water conserving fixtures
C: Treat wastewater onsite to tertiary standards
D: Install indigenous or adaptive plants in the landscape

参考答案: BC

本题解释:
Notes:

Reference: LEED 2009 for New Construction and Major Renovations Rating System

This question is asking about the two ways to achieve the Innovative Wastewater Technologies credit.
A:Drip irrigation is a strategy to achieve the Water Efficient Landscaping credit.
B:A project that can reduce potable water use for building sewage conveyance by 50% through the use of water conserving fixtures or by using nonpotable water can earn the Innovative Wastewater Technologies credit.
C:A project that treats 50% of wastewater onsite to tertiary standards can earn the Innovative Wastewater Technologies credit. Tertiary treatment of wastewater leaves the water in a state where it can be used for agriculture or discharged back into the environment. It is not suitable for drinking.
D: Planting indigenous or adaptive plants helps achieve the Water Efficient Landscaping credit.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏1
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-7-7 00:18 , Processed in 0.076916 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部