An office major renovation is attempting to reuse the building where possible. T

[复制链接]

1759

主题

1

好友

5692

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-11-5 13:42:04 |只看该作者 |倒序浏览
试卷: LEED AP BD+C模拟题D[查看]
An office major renovation is attempting to reuse the building where possible. The
following items have been maintained during the renovation:

Item Size(sf) ; Reused Area(sf) ;%Reused
Foundation ;14,350 ; 14,350 ; 100%
Exterior Walls ; 54,063 43,250 ; 80%
(excluding windows);
Interior Structural Walls; 767 ;430 ; 60%
Exterior Windows ; 1,280 ; 320 ; 25%

What percentage of the building qualifies for Materials and Resources Credit, Building
Reuse-Maintain Existing Walls, Floors, and Roof?
A: 85%
B: 83%
C: 82%
D: 84%

参考答案: D

本题解释:
Notes:
Only the Foundation, Exterior Walls, and Interior Structural Walls can count to MR Credit
1.1. So the calculation that looks like this:
Reused foundation = 14,350 SF
Exterior Walls = 43,250 SF
Interior Structural Walls = 430 SF
14,350SF + 43,250SF + 430SF = 58,030 SF
58,030SF is then divided into the total amount of material that could have qualified
14,350 + 54,063SF + 767 = 69,180 SF
58,030/69,180 = .838, round up, 84% is the answer
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-7-7 05:21 , Processed in 0.073241 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部