A CxA has been selected to perform the fundamental commissioning of a new bank <

[复制链接]

1759

主题

1

好友

5692

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-11-10 17:58:37 |只看该作者 |倒序浏览
试卷: LEED AP BD+C模拟题B[查看]
A CxA has been selected to perform the fundamental commissioning of a new bank
building. Which of the following must the CxA commission for LEED certification?(choose 2)
A: Off-site renewable energy systems
B: Lighting and daylighting controls
C: HVAC
D: Building envelope
E: Gravity based water pump

参考答案: BC

本题解释:
Notes:
Reference: Energy and Atmosphere Prerequisite, Fundamental Commissioning of Building
Energy Systems,
At a minimum the following energy-related systems must be commissioned:
HVAC
Lighting and daylighting controls
Domestic hot water systems
Renewable energy systems (wind, solar)
Remember - it must be onsite, and it must consume energy.

A gravity based water pump does not consume energy and would not need commissioning.
The building envelope is not one of the minimum systems for Fundamental Commissioning.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-7-7 18:33 , Processed in 0.075767 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部